Regulation (EU) 2024/3110

The new Construction Products Regulation already applies. Its passport conditions are in force, while the system that issues one waits on a delegated act.

Manufacturers of products covered by a harmonised technical specification draw up a declaration of performance and conformity, and the environmental characteristics phase in over three steps. Norruva carries the declaration, the essential characteristics and the environmental data as passport content, ready for the day the system opens.

ProductsMineral Wool Board 100 mmPublished

Construction products passport

Northline Mineral Wool Board 100 mm · SKU MWB-100-EU

Regulation (EU) 2024/3110

Sample data. Northline is a fictional brand and the GTIN comes from the GS1 example range.

Passport data6 of 8 fields
  • Declaration referenceDeclaration of performance and conformity, on fileVerified
  • Reaction to fireA1Verified
  • Thermal conductivity0.035 W/(m·K)Verified
  • Global warming potential6.4 kg CO2e per m2, modules A1 to A3Verified
  • Assessment and verification systemSystem 1Verified
  • Harmonised technical specificationReference and clauses assessedPending

+2 more

Last updated May 12, 2025 at 10:24 AM

Concrete blocks stacked on pallets on the conveyor of a block plant
Construction productsRegulation (EU) 2024/3110

The law

The regulation that governs it. Every statement below names the instrument it comes from, the article it sits in, and the date of the copy we hold.

Held instrument

Regulation (EU) 2024/3110

Regulation (EU) 2024/3110 replaces the earlier construction products regime. Its declaration and passport conditions apply now. Its passport system, content list and issuance duty are all measured from a delegated act that has not been adopted.

  • The Regulation applies from the date set in Article 96, and Regulation (EU) No 305/2011 is repealed with effect from that same date, apart from the articles Article 94 lists.Art. 96 and Art. 94 · 8 January 2026In law
  • A manufacturer whose product is covered by a harmonised technical specification must draw up a declaration of performance and conformity before placing that product on the market.Art. 13(1) · 8 January 2026In law
  • The declaration must cover the essential characteristics listed in points (a) to (d) of Annex II, the climate change effects group.Art. 15(3)(a) · 8 January 2026In law
  • Once the delegated act under Article 75(1) requires one, a construction digital product passport must be linked through a data carrier to a persistent unique identification code of the product type, must rest on open standards in an interoperable format without vendor lock in, and must not store end user personal data without that end user consenting.Art. 77(1)In law
  • The declaration extends to the essential characteristics listed in points (e) to (m) of Annex II.Art. 15(3)(b) · 9 January 2030In law
  • The declaration extends to the remaining essential characteristics, points (n) to (s) of Annex II.Art. 15(3)(c) · 9 January 2032In law
  • The delegated act that sets up the construction digital product passport system has not been adopted, so the system it establishes does not exist yet and no date runs from it.Art. 75(1)Not adopted
  • The passport content list in Article 76 becomes operative only once that delegated act is in force, so any construction passport content deadline you see quoted is a placeholder rather than a date in law.Art. 76(2)Not adopted

Source: CELEX 32024R3110 · as of 18 December 2024

Dates

Dates that apply. Only obligations that carry a date in a held text appear here.

Construction products obligations

Each date below restates a dated obligation in the instrument named on the card.

  1. 18 January 2026

    The Regulation applies from the date set in Article 96, and Regulation (EU) No 305/2011 is repealed with effect from that same date, apart from the articles Article 94 lists.

    Art. 96 and Art. 94 · In law

  2. 29 January 2030

    The declaration extends to the essential characteristics listed in points (e) to (m) of Annex II.

    Art. 15(3)(b) · In law

  3. 39 January 2032

    The declaration extends to the remaining essential characteristics, points (n) to (s) of Annex II.

    Art. 15(3)(c) · In law

The declaration duties are in force. The passport system, its content list and the duty to issue one all run from a delegated act under Article 75(1) that has not been adopted, so no construction passport date can be stated.

Data model

What the passport carries. Every field, the sample value it takes, and the platform module that models it.

Sample values are fictional. Northline is an invented brand.
FieldSampleModelled by
Declaration referenceDeclaration of performance and conformity, on filecompliance-kernel-engine/application/cpr-compliance/CPRComplianceProjection.ts
Reaction to fireA1compliance-kernel-contracts/domain/value-objects/ConstructionPassport.ts
Thermal conductivity0.035 W/(m·K)compliance-kernel-contracts/domain/value-objects/ConstructionPassport.ts
Global warming potential6.4 kg CO2e per m2, modules A1 to A3compliance-kernel-contracts/domain/value-objects/ConstructionPassport.ts
Assessment and verification systemSystem 1compliance-kernel-contracts/domain/value-objects/ConstructionPassport.ts
Harmonised technical specificationReference and clauses assessedcompliance-kernel-contracts/domain/value-objects/ConstructionPassport.ts
Substances of concernSafety data sheet and candidate list entries, none presentcompliance-kernel/domain/utils/reach-svhc-utils.ts
End of lifeDeconstruction, demolition and recovery guidancecompliance-kernel-engine/application/cpr-compliance/CPRComplianceProjection.ts

The cost of waiting

What happens if you don't adapt?

A passport is checked at the point a product enters the market. When the record is missing, the product is what waits.

Products blocked from the EU market

Where an instrument requires a Digital Product Passport for a product group, products without one risk restricted access to the EU market.

A data project that becomes an emergency

A passport is a data project before it is a compliance one. Started late, it turns into re-keying, chasing suppliers and rework across systems, against a fixed date.

Audit risk and regulatory exposure

Fragmented or incomplete product data raises the risk of a failed audit, penalties and a correction you have to make in public.

The workflow

From your systems to a verified passport. Five steps, the same on every industry page, because the path does not change with the product group.

01

Create the product record

Start from the SKUs you already hold. The product record is what the passport hangs on, one per trade item.

02

Collect supplier data

Request the fields you do not hold from the party that holds them, with a due date and a trail of who answered.

03

Attach evidence

Test reports, declarations and certificates land in the evidence vault, attached to the field they support.

04

Run compliance checks

The industry template checks every required field and names the gaps before anything is published.

05

Publish the passport

The passport resolves from the product GS1 Digital Link, showing each audience only what it is allowed to see.

The bundle

The products behind it. The same platform, assembled for this product group.

Standards

The rails every passport runs on.

The passport data model, identifiers, data carriers and exchange formats follow EN 18216, EN 18219, EN 18220, EN 18221, EN 18222 and EN 18223, the six standards cited in the Official Journal by Implementing Decision (EU) 2026/1736. Norruva implements them as the rails every passport runs on.

See how we hold standards and evidence ›

Questions

Questions, answered. What teams in construction products ask before they start.

If the answer you need names a date, it comes from the held text of the instrument cited above it.

  • No. Article 77 sets the conditions a construction passport must meet and applies from the general application date, but the system in Article 75(1) is established by a delegated act that has not been adopted. Until it is, no issuance date exists.

  • The declaration of performance and conformity under Article 13(1). Regulation (EU) No 305/2011 is repealed with effect from the general application date, apart from the articles listed in Article 94.

  • In three steps set by Article 15(3): points (a) to (d) of Annex II first, then points (e) to (m), then points (n) to (s). The timeline on this page shows all three dates.

  • Article 16(1) is satisfied when the declaration sits inside a digital product passport that meets the Article 76 conditions and is available through the Article 75 system. That is the shape Norruva builds to.

Start your first passport.

Model construction products in test mode, or talk to us about the rollout across your catalog.